Design, specify, test, and commission the interconnection infrastructure between the new National Grid/Deepwater Wind substation, and existing BIPCo substation. This is the first offshore wind project in the United States, and will provide 100% green wind power to the island when officially commissioned in May 2017.
Design, specify, and award construction bid to build the electrical infrastructure for the newly opened race track.
Design, size, and specify the electric service for the new clam shack, from the main breaker panel to the individual outlets for all the equipment necessary to run the restaurant.
Design fully functional off-grid lighting systems for parking lots and roadways, utilizing solar panels and deep -cycle batteries. New installation or retrofit. These systems use AC lights, not DC lights like most systems available today, making retrofitting existing lights possible and economical.
We are in the initial design stages of converting a gasoline powered BMW to a fully battery powered one with the goal of both preserving the original driving characteristics, and providing a full conversion package for interested customers. We will publish blogs and videos documenting the project. Stay tuned!
Copyright © 2017 New England Power Consulting, LLC - All Rights Reserved.
Powered by GoDaddy Website Builder